Skip to content

Chart Lifecycle

Most of G2’s capabilities are exposed to users through the Chart object. Here’s an example of creating a simple bar chart:

import { Chart } from '@antv/g2';

const chart = new Chart({
  container: 'container',
});

chart.options({
  type: 'interval',
  data: [
    { genre: 'Sports', sold: 275 },
    { genre: 'Strategy', sold: 115 },
    { genre: 'Action', sold: 120 },
    { genre: 'Shooter', sold: 350 },
    { genre: 'Other', sold: 150 },
  ],
  encode: { x: 'genre', y: 'sold' },
});

chart.render();

Let’s explore the core usage of the Chart.

Usage

Chart Instance

Every visualization in G2 is created by instantiating a new chart instance using the Chart object:

import { Chart } from '@antv/g2';

const chart = new Chart({
  /* chart options */
});

Global Options

You can specify some global options via new Chart(options), such as the mounting container, width, height, etc. All options are optional.

// Specify options as needed
const chart = new Chart({
  width: 800, // Chart width
  height: 400, // Chart height
  container: 'chart', // ID of the mounting container
});

Mounting the Chart

A chart instance must be mounted before it can be rendered on the screen. There are two ways to mount it.

<div id="chart"></div>

First method, automatic mounting.

const chart = new Chart({
  container: 'chart', // Specify the mounting container ID
});

// Or
const chart = new Chart({
  container: document.getElementById('chart'), // Specify the mounting container
});

Second method, manual mounting.

const chart = new Chart();

// Declare visualization
// ...

const container = chart.getContainer(); // Get the mounted container
document.getElementById('chart').appendChild(container);

Rendering the Chart

Of course, you need to call chart.render before the chart becomes visible.

// Create a chart instance
const chart = new Chart({
  container: 'chart',
});

// Declare visualization
// ...

// Render
chart
  .render()
  .then(() => {
    // Render successful
  })
  .catch((error) => {
    // Render failed
  });

Updating the Chart

When modifications are made to the declared visualization through the chart instance API, simply calling chart.render again will update the chart.

// Initial render
chart.render();

// Update declaration
// ...

// Update chart
chart.render();

Clearing the Chart

Clears the canvas and cancels event listeners. This also clears chart configurations and is often used when drawing a new chart.

chart.clear();

Destroying the Chart

Destroys the canvas and cancels event listeners. This is often used when destroying components and pages.

chart.destroy();
© Copyright 2026 Ant Group Co., Ltd..备案号:京ICP备15032932号-38
Site search
Documentation and examplesType to start searching

Search documentation, APIs, and examples

↑↓Select↵OpenEscClose